Following the clearing of the gutter blockage at the corner of the third passage in Arak's historic bazaar, paving work on this section of the passage was carried out by the executive staff of Arak's Historic District Municipality with the aim of organizing the pedestrian space and restoring suitable conditions for traffic.
This operation was carried out as part of the service and infrastructure measures of urban management in the historic bazaar complex, and during it, after the waterlogging caused by the gutter blockage was resolved, the necessary groundwork for paving and organizing the passage surface was provided.
With the implementation of this operation, the damaged section of the passage was repaved after the infrastructural problem was resolved, and the necessary conditions for better use of this area in Arak's historic bazaar were فراهم آمد.
