Following recent rainfall, Arak municipality operational teams identified surface water accumulation points and carried out infrastructure projects to resolve the waterlogging.
One of the projects implemented after the recent precipitation over the past weeks was the curbing and surface water drainage project on Hafez Street, opposite the Central Governorate.
In this project, 40 meters of new curbing were installed, and in order to correct the slope for surface water drainage, about 15 tons of asphalt were spread on this passageway.
It should be noted that the municipality has identified problematic points related to surface water accumulation in Arak's six urban districts and, based on existing priorities, will proceed with improving and upgrading these points.