The acting mayor of Arak announced the municipality’s readiness to provide services during the winter season.
Alireza Bayatian said on Wednesday afternoon, the fourth of Azar, at the first meeting of the Arak Municipality Winter Operations Management Headquarters: This meeting was held with the aim of reviewing the readiness level of the machinery and equipment needed for winter operations, service personnel, addressing flood-prone areas, and also detailed planning for the municipality’s 100 percent readiness in the winter season and during precipitation.
He said that in the current period of municipal management, matters related to city management are being followed up and implemented in the districts, adding: The municipality of Arak is making every effort to achieve the satisfaction and peace of mind of citizens in the city.
The acting mayor of Arak stated: Regarding the necessary readiness and stockpiling of required items for the winter season, 1,400 tons of salt have been available in the municipality’s warehouse since last year, and 1,100 tons of a salt-and-sand mixture have also been prepared. Also, 70,000 packaged bags of salt will be distributed for citizens’ use.
Bayatian said: Preparing 91 specialized winter machinery and equipment units, including 12 snowplow and salt-spreader blades, ten dump trucks with snowplow blades, 5 loader snowplow blades, 8 loaders, seven Bobcats, 5 10-ton and 3-ton cranes, one rubber-tired excavator, two crawler excavators, five graders, 9 backhoe excavators, two fuel tankers, and 40 drivers to operate snow-removal machinery, is part of the municipality’s measures in the construction organization to welcome the winter season.
The acting mayor of Arak said: The standby readiness of 145 units of municipal service machinery and equipment, including 60 Khavar trucks for salt spreading, six Nissan dump trucks, two snowplow loaders, one Gentex vehicle, 9 water jets, two mechanized boulevard washing vehicles, one tank washer, 30 garbage transport press vehicles, 14 municipal discipline and inspection patrol vehicles, and 600 municipal service workers for cleaning and snow removal of streets, are among the other measures of Arak’s urban management set for the winter season.
He emphasized: The fire department and the visual, landscape, and green space organizations are also in full readiness to serve citizens during the winter season and precipitation, with various equipment, machinery, and the required human resources.
Bayatian stated: In recent times, the municipality of Arak has prepared the urban space and environment for the winter season by dredging canals, covered and open waterways, and the city river, as well as removing flood-prone points in the city through corrective measures.
He emphasized: With the measures taken, citizens can have complete peace of mind regarding the municipality’s readiness in the winter season.
The acting mayor of Arak, noting that the municipality’s success in any field requires the participation and cooperation of citizens, said: It is hoped that during the season of precipitation this level of cooperation and participation will increase significantly.


